• Total no. of flats: 48 nos.
  • Total area (plinth) of construction: 55000 sq.ft.
  • Year of commencement: April, 2012
  • Projected year of completion: September, 2013
  • Occupancy: Booking started

 

 

location map

 

 

plan

 

 

 

 

 

 

Facilities
  • Intercom
  • Community Hall
  • Generator backup
  • TV & Telephone point
  • Elevator
  • Round the clock security
  • Car parking*
  • *at extra cost
Specifications
  • Structure: RCC structure.
  • Flooring: Vitrified tiles in living / dining and in Bed rooms.
  • Walls: Plaster of paris finish with primer.
  • Doors: Flush doors / Bathrooms – PVC door.
  • Windows: Aluminium sliding with grill.
  • Sanitary: Sanitary fittings of reputed brand.
  • Kitchen: Antiskid Ceramic tiles flooring & Granite top and Stainless steel sink.
  • Bathrooms: Antiskid Ceramic tiles flooring & wall tiles upto door height.
  • Electrical: Concealed wiring.
  • Plumbing: Concealed pipes.

Be one with the spirit of life
Life seldom gives us opportunities to experience its spirit with verve. Discovering the child in you while playing with your son in the vast Landscaped Gardens, sweating it out in the state-of-the-art AC Gym, celebrating your daughter’s marriage alongwith your neighbourhood folk at the AC Community Hall or reading the latest Vikram Seth at the Library. Seems like a dream? But it’s true. All of these and many more at SILVER SPACE, one of the largest residential complexes in Madhyamgram. With over 75% open space SILVER SPACE is destined to fill your life with countless moments of togetherness and give you an opportunity to “Live Free and Feel Free”.

Location Map

plan

Construction Status

Silver Space – Construction Status – 2, 3 BHK apartments in Madhyamgram

Project quarter ending 31.12.2018

Sale of Flat
  • Type – 2 BHK- 51 nos
  • Type- 3 BHK- 65 nos
  • Type-Duplex – 7 nos
  • Total – 123 Nos
Garage sold
  • 112 nos
Total 3 building outside paint under progress
Flooring , putty , primer grill works done in each floor
Internal infrastructure
  • Service lift ( 1 in each building) for 3 building completed
  • Passenger lift ( 2 in each building) for 3 building under progress
  • Fire – Under progress
  • STP- Under progress
  • UGR- Completed
  • Road – under progress
location advantage
  • 2 min. from upcoming Metro
  • 10 min. drive from NSCBI Airport
  • 15 min. drive from Newtown
  • 25 min. drive from Sector-V, Salt Lake
specifications

Structure

  • Pile foundation
  • Earthquake Resistant RCC Superstructure

Wall finish

  • Internal walls finished with POP & Primer
  • External walls weather-shield paint and / or textured coating finish as per design of the architect

Flooring

  • Living / Dining / All Bedrooms vitrified tiles

Doors

  • Main door – Decorative main door with night latch
  • All internal doors – Seasoned hard wood frames with flush core moulded shutters

Windows

  • Powder coated /anodized aluminium window with glazing

Kitchen

  • Flooring – Anti-skid ceramic tiles
  • Wall finishes – Ceramic tiles – Dado upto 2 ft above working platform. Granite counter with stainless steel sink

Toilets

  • Flooring – Anti-skid ceramic tiles
  • Wall finishes – Ceramic tiles – dado – upto 7 ft. C.P. fittings and sanitary fittings of reputed make

Electrical

  • AC points in all bedrooms, living and dining
  • Sufficient electrical points in living rooms and telephone socket provision
  • Modular switches
  • Intercom system

Elevators

  • Two in each block
  • Service Lift – One in each block
  • Total no. of flats: 8 nos.
  • Total area (plinth) of construction: 8000 sq.ft.
  • Year of commencement: September, 2009
  • Year of completion: June, 2010
  • Occupancy: 100%

 

  • Total no. of flats: 18 nos.
  • Total area (plinth) of construction: 12000 sq.ft.
  • Year of commencement: September, 2000
  • Year of completion: June, 2001
  • Occupancy: 100%

recent project

silver space
Doharia, Madhyamgram